No | Nama Peserta | K | SK | SB | B | A | T | ST | P | PT | HN | H | SH | SA | P | PK | Alasan |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | CV. RAJAWALI ENGINEERING CONSULTANT - 83.910.198.7-124.000 | 80,0 | 80,0 | 71,0 | Rp. 271.711.000,00 |
Rp. 271.711.000,00 |
29,98 | 76,92 | |||||||||
2 | CV. BILLINDO ENGINEERING CONSULTANT - 02.263.005.7-124.000 | Tidak memenuhi syarat | |||||||||||||||
3 | CV. ABDI KRIASY KONSULTAN - 02.094.145.6-124.000 | 70,0 | 70,0 | ||||||||||||||
4 | CV. SAKHA SINERGY - 31.215.710.0-124.000 | 65,0 | 65,0 | ||||||||||||||
5 | cv.hosmap - 31.705.419.5-124.000 | 50,0 | 50,0 | ||||||||||||||
6 | PT. TRIJAYA UTAMA KONSULTAN - 31.212.942.2-124.000 | 50,0 | 50,0 | ||||||||||||||
7 | PT. CITA KREASI LATENA - 02.749.083.8-124.000 | 55,0 | 55,0 | ||||||||||||||
8 | CV. MANUNGGAL RIAMERTA DEV. CONSULTANT - 01.872.007.8-113.000 | 70,0 | 70,0 | ||||||||||||||
9 | PT. ABATA RENCANA KARYANUSA - 03.047.589.1-211.000 | 60,0 | Tidak memenuhi syarat | ||||||||||||||
10 | CV. CHEZIA CONSULTANT - 31.278.710.4-126.000 | ||||||||||||||||
11 | CV. BLESS QUEEN - 83.944.519.4-126.000 | ||||||||||||||||
12 | PT.MULTI GUNA ENGINEERING KONSULTAN - 01.521.375.4-201.000 | ||||||||||||||||
13 | CV. FERNANDO JAYA - 31.504.153.3-126.000 | ||||||||||||||||
14 | CV. IVAN - 21.022.014.1-126.000 | ||||||||||||||||
15 | CV. KARYA TEROBOSAN - 82.043.124.5-126.000 |
- A Evaluasi Administrasi
- T Evaluasi Teknis
- ST Skor Teknis
- P Penawaran
- PT Penawaran Terkoreksi
- HN Hasil Negosiasi
- SH Skor Harga
- SA Skor Akhir
- B Pembuktian Kualifikasi
- K Evaluasi Kualifikasi
- SK Skor Kualifikasi
- SB Skor Pembuktian
- H Evaluasi Harga/Biaya
- P Pemenang
- PK Pemenang Berkontrak